Scroll Top
109 Coolgardie Avenue, Redcliffe, WA, 6104
W BG and ENH

CCI’s jacking frame telescopes hydraulically and is where the injector head is positioned and then aligned with the well PCE. The jacking frame has been designed and employed to sit on top of a bridge which can be positioned to align with the well.